Cars · Guide

How to Install a Home EV Charger Under England's New October 2026 Rules

Published:

A Tesla Model 3 charging at the dual cable Tesla Supercharger in Imperia, Italy
Image credit: Lklundin · CC BY-SA 4.0 · Wikimedia Commons

In brief

From 21 October 2026, most homeowners in England no longer need planning permission to install a home EV charger or a cross-pavement cable gully, which the Department for Transport says can cut installation costs by up to £300. Highway authority approval is still required for cable channels run under pavements, and homes in conservation areas or near listed buildings are excluded.

The UK government removed planning-permission requirements for most home electric vehicle charger installations in England from 21 October 2026, through an amendment to the General Permitted Development Order (GPDO). The change affects two separate situations: chargers fitted on a driveway or garden, and cable channels (commonly called 'gullies') that run under the pavement to reach a car parked on the street.

What the October 2026 Rule Change Covers

The new rules come from the Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2026 (SI 2026/1056). For households with a driveway or garden, existing permitted-development rights for wall-mounted chargers (Class D) and free-standing upstands (Class E) were widened so they apply anywhere in a property's curtilage, not only on an existing off-street parking space. For households without a driveway, a new Class F right lets a cross-pavement cable channel be installed without a separate planning application, provided it is done by, on behalf of, or with the authorisation of the local highway authority.

The Department for Transport announced the change on 21 October 2026. Minister for Buses and Local Transport Simon Lightwood said the government was cutting 'unnecessary red tape' on home charging.

We're saving drivers up to £300 off the cost of installing home charging by cutting unnecessary red tape.

— Simon Lightwood MP, Minister for Buses and Local Transport, Department for Transport

Step-by-Step: Installing Your Charger Under the New Rules

  1. Work out which category applies to you: a charger on your own driveway or garden (Class D/E rights), or a cross-pavement gully to reach a car parked on the street (new Class F right).
  2. Check whether your home is in one of England's roughly 10,000 conservation areas, or near a listed building or scheduled monument. These areas are excluded from the new permitted-development rights and still require a full planning application.
  3. For a driveway charger, make sure the unit fits the permitted-development limits: a wall-mounted box (Class D) must be no larger than 0.2 cubic metres, no taller than 1.6 metres, project no more than 0.2 metres from a wall facing a highway, and leave at least 1.5 metres of clear footway; only one qualifying outlet is allowed per dwelling.
  4. For a cross-pavement gully, apply to your local highway authority for authorisation under section 178 of the Highways Act 1980 instead of a planning application. The authority checks the proposed route against underground gas, water, electricity and telecoms infrastructure before approving it.
  5. Ask your council directly whether it currently allows gullies at all. More than 20 English local authorities, including Ealing, Waltham Forest and Hackney, were still refusing to approve them as of October 2026, citing safety and accessibility concerns.
  6. Compare council fees before booking an installer. Reported charges for gully approval range from about £250 in South Gloucestershire to £499 in Surrey and £815 in Redbridge, where a council grant of up to £1,200 can offset part of the cost.
  7. Check for ongoing charges. Some councils, including Redbridge and Enfield, bill annual maintenance fees for gullies of £185 and £107 respectively.
  8. Once the charger is installed, switch to an off-peak or EV-specific electricity tariff to get the full benefit of cheaper home rates rather than public-charger prices.
  9. If you rent your home or live in a flat, watch two Department for Transport consultations open until 16 December 2026, on leaseholder and tenant access to chargepoints and on mandatory charging provision in new housing developments.

What It Costs, With and Without the New Rules

The Department for Transport estimates the removal of planning permission saves up to £300 on installation and that home charging can cost from 2p per mile, producing running-cost savings of up to £1,750 a year compared with petrol or diesel. Separate reporting has compared real household bills: driver Gregg Francis was reported to fully charge his car at home for around £6, against £30 to £63 for an equivalent charge at public chargepoints.

Reported EV charging and installation costs, October 2026
ItemFigureSource
Home charging (off-peak, average)about 8p per kWhGuardian reporting via AOL
Public rapid charging (average)about 54p per kWhGuardian reporting via AOL
Example full home charge (Gregg Francis)about £6Guardian reporting via AOL
Same charge at public chargepoints£30–£63Guardian reporting via AOL
Gully approval fee, South Gloucestershire£250Guardian council survey via AOL
Gully approval fee, Surrey£499Guardian council survey via AOL
Gully approval + fees, Redbridge (London)£815 (grant up to £1,200 available)Guardian council survey via AOL
DfT estimate: installation saving from scrapping planning permissionup to £300GOV.UK, Department for Transport
DfT estimate: annual running-cost saving vs petrol/dieselup to £1,750GOV.UK, Department for Transport

Limits, Exceptions and What Comes Next

The new rights do not apply everywhere. Conservation areas, and land near listed buildings or scheduled monuments, are excluded from the expanded Class D/E rights and from the new Class F cross-pavement right, so homeowners there still need a standard planning application. Even outside those areas, a highway authority can still refuse to authorise a gully, and reporting found that more than 20 councils in England had not approved any cross-pavement gullies as of October 2026.

Motoring organisation the RAC welcomed the change but said it would not solve every problem for drivers without a driveway. RAC head of policy Simon Williams said home electricity is free of VAT while public charging carries 20% VAT, making home charging significantly cheaper, and that the reform alone does not guarantee a resident without a driveway can park close enough to their home to use a cable.

Liberal Democrat peer Caroline Pidgeon, who had campaigned for the change, said approvals for cross-pavement charging had previously taken up to 15 months under the old planning-permission system, and that around one in three English households lack a driveway, according to reporting on the policy.

Questions

Do I still need planning permission for a home EV charger in the UK?
From 21 October 2026, most driveway/garden chargers and cross-pavement cable gullies no longer need a separate planning application in England, under an amendment to the General Permitted Development Order. Homes in conservation areas or near listed buildings and scheduled monuments are excluded and still need full planning permission.
What is a pavement gully for EV charging?
It is a narrow channel built into the pavement that lets a charging cable run safely from a house to a car parked on the street, instead of trailing the cable loose across the footway. Installing one now requires highway authority authorisation under the Highways Act 1980 rather than a planning application.
How much money can the new rules save?
The Department for Transport says scrapping the planning-permission requirement can cut installation costs by up to £300, with home charging potentially costing from 2p per mile and saving up to £1,750 a year compared with petrol or diesel, according to the department's announcement.
Will every council allow me to install a gully?
No. Reporting found that more than 20 English local authorities, including Ealing, Waltham Forest and Hackney, had still not approved any cross-pavement gullies as of October 2026, citing safety and accessibility concerns, even though planning permission is no longer the barrier.
What if I rent my home or live in a flat?
The October 2026 change mainly affects homeowners. The Department for Transport has launched consultations, open until 16 December 2026, on giving tenants and leaseholders better access to chargepoints and on requiring charging provision in new housing developments.

Sources

  1. GOV.UK (Department for Transport) — Drivers to save up to £300 when installing EV chargers at home as government slashes unnecessary red tape
  2. AOL UK — Andy Burnham driveway rule confirmed
  3. AOL UK (Guardian) — 'I can charge my car for £6': could new rules cut costs for EV drivers?
  4. PlanningGeek — GPDO changes unlock home EV charging from 21st October
  5. RAC Media — Government slashes red tape on EV gullies: RAC reaction

This piece was prepared with artificial intelligence and passed an automated source check before publication. If you see an error, ask for a correction. Request a correction or reply · How we make this